HYDRO-ELECTRIC WING

Although primarily intended as an Irrigation Project, the impounded water in Tungabhadra Reservoir is also utilized to generate power before being let out into the canals for irrigation purpose. The power generated on the left side is entirely used by Karnataka while that generated through two power houses on the right side is shared by states Karnataka and Andhra Pradesh in the ratio of 20:80. One Power House is at the foot of the dam and another at Hampi, 21Km from the dam. The Scheme of generating electricity at these two powerhouses is called “Tungabhadra Hydro Electric Scheme”(TBHES). Work on Dam Power House was taken up in 1951 while that on Hampi power house in 1956. These power houses were commissioned in 1957 and 1958 respectively.

Health Wing

Health Wing of the Board looks after the general sanitation of the Board colonies and other adjacent public areas in the TB Dam colonies and Hampi Colonies. It also undertakes various health programmes catering to the needs of the Board employees and also public.

Irrigation Wing

The Irrigation Wing (IW) of the Board is in-charge of maintenance of right half of the main dam, whole of the reservoir, Right Bank HLC and Right Bank LLC up to Board’s limit. The Low Level Canal also includes Power Canal and certain common distributories. The total areas localised for irrigation under the project both on right bank and left bank including areas in Karnataka and Andhra Pradesh is 4.899 lakh ha (12.1 lakh acres)(as per project record) excluding the schemes benefited with the assistance of water from Tungabhadra reservoir. The irrigation benefits under each canal/system of the project are given at SALIENT FEATURES OF CANALS IN TUNGABHADRA IRRIGATION SYSTEM